Commission III of the South Kalimantan provincial legislature inspected two coal operations in Tanah Laut on 11 September 2026. PT Jorong Barutama Greston reported 1,216.84 hectares reclaimed of 1,416.89 hectares disturbed, watershed rehabilitation of 2,642.96 hectares at full completion, and hazardous waste accounted for to five decimal places. Reported figures and verified figures are not the same thing, and this is how the gap closes.

At a glance
1,216.84 hectares
Reclaimed of 1,416.89 hectares disturbed, around 85 percent
4,370.21 hectares
Total reclamation area within the company's plan
2,642.96 hectares
Watershed rehabilitation recorded at full completion
11.90595 tonnes
Hazardous waste recorded between January 2025 and August 2026

Commission III of the South Kalimantan provincial legislature visited two coal operations in Tanah Laut Regency on 11 September 2026: PT Arutmin Indonesia at its Asam Asam site, and PT Jorong Barutama Greston. Mustaqimah, who chairs the commission, said both companies are carrying out reclamation on a continuing basis and that some reclaimed land has already been handed to communities and to regional government.

The figures presented at Jorong Barutama Greston are unusually specific. The company's total reclamation area stands at 4,370.21 hectares. Of that, 1,416.89 hectares has been disturbed and 1,216.84 hectares reclaimed, roughly 85 percent. Watershed rehabilitation covering 2,642.96 hectares is recorded as fully complete.

Hazardous waste is accounted for to five decimal places. Between January 2025 and August 2026 the company recorded 11.90595 tonnes, of which 10.8956 tonnes went to licensed handlers and 1.01035 tonnes remains in dedicated storage.

Ahmad Gazali Rahman, technical head and site director at Jorong Barutama Greston, described the reclamation sequence as land arrangement, topsoil spreading, planting, maintenance, assessment, and handover. Firhansyah of external affairs at Arutmin Asam Asam set out environmental management covering air and water quality monitoring, mine water handling through SPARING and wetland systems, and hazardous waste transport documented by manifest.

Reported is not the same as verified

Sirkularium has argued through this beat that Indonesia measures the revenue side of mining closely and the environmental side loosely. Reclamation is the partial exception, because hectares are counted. What this visit illustrates is the next distinction, which is between a number a company reports and a number somebody has checked.

A legislative commission travelling to a site and taking figures directly is a weaker instrument than an audit, and it would be wrong to present it as more than it is. But it is considerably stronger than a figure arriving in an annual report, and the difference matters. Someone outside the company stood on the land, asked what the number was, and published it under their own name.

The B3 waste accounting is the most telling detail. Tracking 11.90595 tonnes to five decimal places, with the split between what was transferred and what remains in storage, is what a functioning manifest system looks like. Hazardous waste has a chain of custody obligation, documentation follows each consignment, and the result is arithmetic that reconciles. Reclamation has no equivalent chain. It has an area figure and a completion percentage.

Indonesia can tell you where 1.01035 tonnes of hazardous waste is sitting. It cannot tell you, with the same confidence, what 1,216.84 hectares of reclaimed land is now producing.

What the commission asked for

The requests made at the visit are more interesting than the figures, because they point at the mechanism rather than the outcome.

The commission urged the companies to use regional institutions for reclamation guarantees and laboratory testing, naming Bank Kalsel and the provincial ESDM laboratory unit. That is a practical proposal. Reclamation guarantee funds have to be held somewhere, and laboratory verification of soil and water has to be performed by someone. Routing both through provincial institutions keeps the capacity, the fee income, and the data inside the province that carries the environmental load.

The commission also asked that replanting be timed to the planting season rather than to the compliance calendar, and that the objective be restoration of environmental function rather than the fulfilment of an administrative metric. That is the correct instinct, and it is the same argument Sirkularium made in examining PT Timah's decade of reclamation in Bangka Belitung. Seedlings planted in the dry season to close out a reporting year produce a hectare count and very little else.

The valuation that would settle it

The methodology to convert this from area reporting into condition reporting exists in Indonesian regulation and has been tested in court.

Permen LH No. 15 Tahun 2012 values forest ecosystems across direct benefits, indirect services, existence value, and option and bequest value. Permen LH No. 7 Tahun 2014 prices ecological damage, environmental economic loss, and recovery cost. The Ministry of Environment has used the latter to win damages and compulsory restoration exceeding Rp721 billion across four cases, including Rp467.843 billion over a 3,480 hectare fire in Musi Banyuasin. Courts accept these figures.

Applying the same instruments to reclaimed land would answer the question the hectare count leaves open. Has soil organic carbon recovered. Does the water body support fisheries. Is the vegetation self sustaining without replanting. Is anyone earning a living from it. Remote sensing supplies canopy cover and water extent on a repeatable schedule at low marginal cost, and ground sampling supplies the chemistry. For a company that has already reclaimed 1,216.84 hectares over many years, most of the evidence is already in the ground.

Sirkularium's view

Provincial oversight of this kind is worth more than it usually receives credit for, and the commission's focus on mechanism rather than headline numbers deserves recognition. Three observations for government and public institutions.

First, oversight visits should collect a small fixed set of condition indicators alongside the area figures. Canopy cover, soil organic carbon, water quality, and whether the land is in productive use would take little additional effort during a site visit and would convert a compliance check into evidence.

Second, the proposal to route reclamation guarantees and laboratory testing through provincial institutions should be pursued. It builds verification capacity where the mines are, and a provincial laboratory that routinely tests reclamation sites becomes the natural custodian of a condition dataset over time.

Third, the contrast between hazardous waste accounting and reclamation accounting is the clearest available argument for reform. One system tracks grams through a chain of custody. The other reports hectares against a plan. The first model is available, it works, and there is no technical reason reclaimed land could not carry a comparable record.

For operators, the case is a favourable one. A company reporting 85 percent reclamation of disturbed land is making a claim it currently has no way to prove beyond area. An independently verified valuation of land, water, and ecosystem condition turns that claim into evidence, and evidence is what holds up when a reclamation guarantee is assessed or a dispute arises.

What to watch next is whether the commission returns to verify the same sites against the same figures, whether Bank Kalsel and the provincial laboratory take up the roles proposed, and whether condition indicators begin appearing alongside hectares in provincial oversight reporting.

PT Jorong Barutama Greston land and watershed figures

Values in hectares

ShareLinkedInWhatsAppFacebookEmail
Sirkularium

Sirkularium is a thought-leadership and advisory institution accelerating the circular transition across solid waste, water, and energy, working with government and public institutions.

In sustainable resources, Sirkularium advises on water, tailings, and ESG governance so resource projects stay credible and investable.

Related articles

Nickel laterite ore stockpiles at an Indonesian mine site with haul trucks and a weighbridge, and processing infrastructure visible in the distance
Sustainable Resources

A ministerial decree signed on 11 September 2026 and effective from 15 September lowers the corrective factor for low grade nickel ore to 14 percent, bringing the state benchmark for 1.2 percent ore to US$24.89 a wet metric tonne. The interesting part is not the number. It is that Indonesia is now iterating a resource valuation method in the open.

By Sirkularium Editorial Team, 8 min read

Copper cathode sheets and refining infrastructure inside a large Indonesian copper smelter complex, with industrial port facilities visible beyond
Sustainable Resources

PT Freeport Indonesia restarted copper cathode production at its US$3.7 billion Manyar smelter in Gresik in September 2026, targeting 5 million pounds this month and rising to 57 million pounds by December. The production side of the ledger is now well measured. The ecosystem side that sits beneath it is where Indonesia's next valuation work lies.

By Sirkularium Editorial Team, 8 min read

Aerial view of an Indonesian nickel or bauxite processing facility with reclaimed green land in the foreground
Sustainable Resources

At a journalism outreach event at Universitas Indonesia on 13 September, state mining holding MIND ID reported Rp159.46 trillion in group revenue and Rp92.56 trillion in state contributions for 2025, alongside 7.48 million trees planted and more than 7,800 hectares reclaimed.

By Sirkularium Editorial Team, 8 min read

Revegetated former tin mining land in Bangka Belitung with young trees and restored water bodies, alongside untouched terrain
Sustainable Resources

Figures published on 13 September 2026 set out a decade of tin reclamation: 3,575.8 hectares returned between 2015 and 2025, 354.05 hectares in 2025 alone, and 411.16 hectares planned for 2026 across six regencies. Indonesia counts reclaimed hectares carefully. It does not yet count what those hectares produce.

By Sirkularium Editorial Team, 8 min read

Alumina refinery under construction beside a bauxite mining area in Kalimantan, with red bauxite soil and processing infrastructure visible
Sustainable Resources

Minister of Energy and Mineral Resources Bahlil Lahadalia said on 11 September 2026 that licensing for UC Rusal's bauxite to alumina plant in Kalimantan is almost final, following President Prabowo's meeting at the Eastern Economic Forum in Vladivostok. Indonesia has built a bauxite refining chain worth measuring. Alumina is the first rung of it, not the last.

By Sirkularium Editorial Team, 8 min read

Nickel ore stockpile beside a processing facility in Sulawesi, with haul roads and reclaimed slopes visible in the background
Sustainable Resources

The Ministry of Energy and Mineral Resources reported on 10 September 2026 that non-tax revenue from nickel reached Rp21 trillion to 31 August, against Rp10 trillion a year earlier. Over the same stretch nickel ore production fell from 320.37 million tonnes to 173.79 million tonnes. Less material left the ground and more value came back from it.

By Sirkularium Editorial Team, 8 min read