Smelters at the Indonesia Morowali Industrial Park began cutting nickel pig iron output by 30 to 40 percent on 22 September 2026 as El Niño reduced river flow. The episode puts a number on something mining valuations usually leave out: the economic worth of a reliable water supply.

At a glance
30 to 40%
Cut in operating load at IMIP's RKEF nickel pig iron plants from 22 September
350,000 t
IMIP installed nickel pig iron capacity per month (about 4.2 million t a year)
Under 4 mm
August 2026 rainfall at the site, against a historical average of 222 mm
1.5 m³/s
Maximum permitted abstraction from the Makarti River

What happened at Morowali

The Indonesia Morowali Industrial Park (IMIP) in Central Sulawesi, the largest nickel processing complex in the country, told its tenant companies over the weekend of 19 and 20 September 2026 that they would need to reduce nickel pig iron (NPI) production because of a water shortage. According to Shanghai Metals Market (SMM), the rotary kiln electric furnace (RKEF) plants in the park began lowering their operating load by roughly 30 to 40 percent from previous levels on Tuesday, 22 September.

The cause is climatic rather than commercial. El Niño has brought a longer and drier season to Bahodopi District in Morowali, and the rivers that supply the park are running low. SMM reports that IMIP draws its water from the Makarti River under a permit allowing a maximum abstraction of 1.5 cubic metres per second. Rainfall at the site in August 2026 was less than 4 millimetres, against a historical August average of 222 millimetres.

IMIP handled the episode with advance notice. As early as 4 September, Dedy Kurniawan, Head of Media Relations at PT IMIP, said that El Niño could reduce production potential by around 30 to 40 percent, and that management and Eternal Tsingshan were accelerating the use of new water sources around the park. On 23 September he confirmed that several smelters had lowered output, including NPI. Reporting on the cut noted that operations had not stopped and that the workforce had not been reduced.

"This condition is what has affected several smelters in the IMIP area, which have seen declines, including in NPI production." Dedy Kurniawan, Head of Media Relations, PT IMIP, speaking to Bloomberg Technoz (Sirkularium translation).

The numbers behind the cut

Bloomberg reported that the curtailment could affect around 100,000 tonnes of NPI, against installed capacity of about 4.2 million tonnes a year, or 350,000 tonnes a month. IMIP said it had not yet received exact figures from its tenants and could not confirm the 100,000 tonne estimate. SMM offered a narrower, time-bound estimate: if the current operating rate holds for half a month, physical NPI output would fall by 50,000 to 70,000 tonnes, equivalent to 5,500 to 7,700 tonnes of contained nickel.

The two estimates measure different things and should be read side by side rather than as a contradiction. The Bloomberg figure describes the total volume in scope. The SMM figure describes the likely loss over a defined fifteen day window. Both depend on how quickly river flow recovers.

Prices give a sense of scale. SMM recorded Indonesian NPI at an FOB average of US$135 per metric tonne unit of nickel shortly before the cuts, down 6.57 percent. A metric tonne unit is ten kilograms of contained nickel, so that price corresponds to about US$13,500 per tonne of nickel in NPI form. On Sirkularium's indicative arithmetic, applying that price to SMM's half-month range gives a production value of roughly US$74 million to US$104 million. That figure is an order of magnitude, not a forecast, but it shows how much economic output rides on one river's flow over two weeks.

The market context softens the immediate effect. SMM notes that stainless steel demand in China is subdued, with October 300 series output expected to fall by more than 100,000 tonnes month on month, and that Chinese port NPI stocks rose 52.5 percent to 53.8 thousand tonnes of contained nickel between 3 and 17 September. On the London Metal Exchange, nickel had fallen about 18 percent from its early May peak before the news, and Bloomberg noted that the cut could help arrest that slide.

Why water belongs in the valuation of mining

Most valuations of a nickel operation start with ore reserves, grade, recovery, processing capacity and price. Water appears, if at all, as an operating cost line: pumping, treatment, permits. The Morowali episode shows that this treatment understates its role. When water is short, capacity cannot be used, and the value of the ore in the ground is deferred.

Water serves several functions inside an integrated park. IMIP has explained that its supply supports hydrometallurgical high pressure acid leaching (HPAL) smelters, coke production, and the steam power plants that feed the smelters. An RKEF line needs cooling water; a power plant needs make up water; a leach circuit needs process water. A shortfall in one river therefore reaches several stages of the value chain at once.

This is where ecosystem services valuation becomes practical rather than academic. The flow in the Makarti River at the permit point depends on the condition of its catchment: forest cover, soil infiltration, and the way upstream land is used. A catchment that holds and releases water slowly is providing a service with a measurable economic value, and the Morowali numbers give that value a reference point. Indonesia already has the methodological tools to express such values in rupiah, including the economic valuation approach in Permen LH No. 7 Tahun 2014, which covers ecological damage, environmental economic loss and recovery cost.

The same logic applies to planning documents. An AMDAL for a smelter or an industrial park includes a water balance and an assessment of the raw water source. Pairing that water balance with a dry year scenario, informed by GIS based catchment mapping and river gauging data, lets operators and regulators see in advance how much production is at risk in an El Niño year and what investment in storage, recycling or alternative sources would be worth.

A season that will run longer

The weather outlook suggests the question will remain live for several weeks. BMKG has classified the current El Niño as very strong, with an ENSO index of +2.63 for July to September and a Niño 3.4 sea surface temperature anomaly of +2.83 degrees Celsius, combined with a positive Indian Ocean Dipole. The agency expects the 2026/2027 rainy season to arrive late in 529 of Indonesia's 865 season zones, 61.08 percent of the total, with most regions starting in November or December 2026.

BMKG Head Teuku Faisal Fathani has said that the combination of El Niño and the Indian Ocean Dipole will worsen and prolong dry periods, and the agency has recommended water conservation, closer drought monitoring and optimised reservoir management across sectors. That guidance, issued in advance, gives industrial parks a clear planning window, and IMIP's early statement on 4 September shows that the warning is being heard.

The constructive reading is that Indonesia's downstream nickel industry is now large enough for its resource dependencies to be measured with the same care as its output. The episode has not led to layoffs, operations continue at reduced load, and the park is already developing additional water sources.

Sirkularium's view

For government and public institutions, the Morowali cut is a useful case study in how natural capital underpins downstream industrial value. It suggests three practical steps.

First, water security can be written into the economic valuation of mining and processing assets as a standard input. A valuation that includes the reliability of raw water supply, tested against dry year hydrology, gives a truer picture of the value that a park or smelter delivers to the regional and national economy, and of the royalty and tax base that depends on it.

Second, catchment condition deserves a place in AMDAL review and in reclamation and watershed rehabilitation obligations as an economic asset, not only an environmental one. GIS based land cover mapping combined with river gauging and ground data can show how much dry season flow a healthy upstream catchment supports. Valuing that flow with an accepted methodology, such as the approach in Permen LH No. 7 Tahun 2014, lets operators, the Ministry of Environment and regional governments agree on what protecting the catchment is worth.

Third, the investment case for water recycling, storage and alternative sources becomes easier to make when the value of production at risk is known. If two weeks of reduced output at one park can represent tens of millions of US dollars, measures that secure supply in El Niño years can be assessed against a clear benchmark.

Sirkularium's recommendation is that operators treat this kind of analysis as ongoing practice, updated each season and independently verified, rather than as a response to a single dry spell. What to watch next: tenant level production figures from IMIP, the pace at which new water sources come on line, the recovery of flow in the Makarti River as the delayed rains arrive, and whether other industrial parks in Sulawesi and Maluku report similar constraints.

IMIP nickel pig iron volumes in context

Values in tonnes of NPI

ShareLinkedInWhatsAppFacebookEmail
Sirkularium

Sirkularium is a thought-leadership and advisory institution accelerating the circular transition across solid waste, water, and energy, working with government and public institutions.

In sustainable resources, Sirkularium advises on water, tailings, and ESG governance so resource projects stay credible and investable.

Related articles

Stainless steel coils or finished nickel products stacked at an industrial park in Morowali, Central Sulawesi, with mining hills in the background
Sustainable Resources

On 27 September 2026 Deputy Governor Reny A. Lamadjido said nickel and other minerals from Central Sulawesi should no longer leave the province half processed. The province's accounts already show the pattern behind that instruction: manufacturing makes up 44.37 percent of the regional economy, mining and quarrying 13.79 percent.

By Sirkularium Editorial Team, 8 min read

One kilogram cast gold bars stamped 999.9 stacked on a weighing table inside a refinery vault, with an assayer recording weights
Sustainable Resources

PT Aneka Tambang bought 9 tonnes of 99.99 percent gold from PT Freeport Indonesia's Gresik precious metals refinery between January and August 2026, the first realised figure against an agreement that allows up to 30 tonnes a year. A second domestic buyer, Hartadinata, took its first 50 kilograms in September.

By Sirkularium Editorial Team, 8 min read

A mobile water treatment unit and a public water hydrant tank serving residents with jerrycans in a dry West Java village
Sustainable Resources

The Ministry of Public Works reported on 26 September 2026 that it had handled 3,288 drought locations since July, distributing 48.9 million litres of clean water to about 1.75 million people and protecting 141,440 hectares of rice fields. Minister Dody Hanggodo said the ministry will add more mobile water treatment units as El Niño extends the dry season.

By Sirkularium Editorial Team, 8 min read

Young native trees growing in dark granular soil on a terraced reclaimed nickel mine slope on Obi Island, with smelter stacks in the far background
Sustainable Resources

Harita Nickel is using slag from its Obi Island smelters as a soil ameliorant on 272 hectares of reclaimed mine land, a practice now written into Indonesia's national standard SNI 9420:2025. The approach converts a large processing residue into a reclamation input, with reported savings of up to 32 percent against organic fertiliser.

By Sirkularium Editorial Team, 8 min read

Public consultation meeting in a Sumbawa hall with community leaders and officials seated before a presentation screen showing a mine development map
Sustainable Resources

PT Amman Mineral Nusa Tenggara opened public consultation on the feasibility study and environmental impact analysis for the Elang copper and gold block in Sumbawa on 22 September 2026. Initial investment was put at Rp6 trillion to Rp8 trillion, and the reserve already stated for Elang runs to 2.5 billion tonnes of ore.

By Sirkularium Editorial Team, 9 min read

Stacked copper cathode sheets at a smelter in West Sumbawa with refinery structures and a gantry crane behind them
Sustainable Resources

PT Amman Mineral Internasional reported net sales of US$2.05 billion and net profit of about US$497.9 million for the first half of 2026 on 21 September. Copper cathode and refined gold made in West Sumbawa supplied US$974 million of that revenue, and a reserve restatement at Batu Hijau shows how much of a mine's stated value is set by assumptions rather than by geology.

By Sirkularium Editorial Team, 9 min read